Etelux Glove Box Regeneration Techniques

From Buildtools
Jump to: navigation, search

one) Regeneration gasoline: a combination of hydrogen and inert gasoline (hydrogen accounts for five% -ten%)

2) Amount: 40L fuel cylinder 10Mpa

three) Regenerative fuel stress: .05Mpa (the gasoline intake per 50 percent hour in the point out of .05Mpa is that the cylinder tension drops by 1.5Mpa. If it exceeds 1.5Mpa, the tension of the force regulator’s plan will be lessened, if it is considerably less than 1.5Mpa Enhance the strain of the tension regulator schedule)

4) Procedure: three hours heating-three hours heating and ventilation-three several hours vacuuming-one hour pumping-ten several hours cooling

5) Measures:

① Join the regeneration gas (verify the pipeline for leaks just after relationship: just after connecting, open up the primary valve of the strain decreasing valve to the utmost, open the auxiliary meter to .1Mpa, turn off the principal valve, wait 15 minutes, Glove Box Application if the force of the auxiliary meter stays at .1 Mpa stays unchanged, indicating no air leakage

>②Set the strain of the auxiliary gauge of the pressure reducing valve to .1Mpa (the tension through ventilation is about .06-.08MPa

>③ Shut the cycle and analyz

r>④Turn on the vacuum pu

r>⑤ Commence regenerat

br>⑥ The new software ends at 20h (cleanse in advance of cleansing, drinking water and oxygen index <200p


6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 ho


7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.